East Berlin, PA

Over the winter of 2015-2016, we teamed up with Galbraith Pre-Design, Inc. to provide a warehouse expansion for Zeigler Brothers, a worldwide leader in aquatic feed production, equipment and research. Our team developed a two phase construction approach that allowed product shipping to continue from the facility during nearly every phase of construction. This allowed the owners to minimize any impacts on their operations and see virtually zero black out in shipping. Some challenges arose throughout the design due to adjacent buildings and tanks. The majority of the new warehouse was a steel frame structure with masonry and steel panel exteriors.